Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading

– Insert bracket 1 into the center of loading rail 4.
– Press release button 2 and push bracket 1 into the desired position in loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5 upwards.

Distribute the load on the cargo tie down rings WARNING
Distribute the load on the cargo tie down rings evenly.
Otherwise, vehicle occupants could be injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.

    See also:

    Capacities
    ...

    Shift ranges
    Introduction When the automatic transmission is in position D, it is possible to restrict or derestrict the shift range. The shift range selected is shown in the multifunction display. The aut ...

    High-beam flasher
    To switch on: turn the SmartKey in the ignition lock to position 1 or 2 or start the engine. Pull the combination switch in the direction of arrow 3. ...